I-75 Express Lanes - Segment A&B

Bridges
Project Hero Image

Overview

Cone & Graham, Inc. is a key partner in the largest and most complex segment of the I-75 corridor, known as Segment AB. This critical 3.1-mile project extends from NW 170th Street to south of Miramar Parkway, providing express lanes in the existing I-75 median. It also includes 2.6 miles of reconstruction along the Homestead Extension of Florida’s Turnpike, accommodating a third-level direct median-to-median flyover express lane connection and new interchange movements.

The project features significant infrastructure improvements, including the construction of 10 new bridges, 4 bridge widenings, and one bridge deck replacement. Additionally, new collector-distributor (CD) roads and ramps at the Miami Gardens interchange are being constructed to enhance traffic flow and improve connectivity.

As part of a larger effort to improve traffic capacity and reduce congestion in both Miami-Dade and Broward counties, Segment AB is a crucial component of the I-75 corridor upgrades. The design services, led by WGI, include roadway and structural design, environmental assessments, drainage systems, utility coordination, and detailed traffic control plans.

Project Information
Client Icon
Client
FDOT
Cost Icon
Contract
$53 million
Location Icon
Location
Broward County
Date Icon
Start Date
November 1, 2014